Fountain maintenance required to comply with the code

Time:2014/11/29 13:06:30  Viewed :759


1 to the fountain equipment maintenance personnel for professional training of personnel, electrical equipment maintenance personnel also need to hold professional certificates.
2 maintenance and repair of electrical equipment should be carried out under the condition of cutting off the power supply, if special circumstances need to live, should do a good job security measures, the important part of the monitoring.
3 fountain water lights to check, a month to tighten the screws (especially concerned about running spring), to avoid the light body caused by water short-circuit fault.
4 standby equipment to start running regularly (every day a high frequency of use, the use of a low frequency of the first change), to prevent the performance of the device is reduced.
5 water pump suction mouth to be cleaned every month, to prevent dirt clogging suction mouth, reduce the work efficiency and even cause damage to the device.
Three waterproof cable must be connected in the condition of no water, and waterproof tape, insulation tape, high voltage insulation tape for the 6 layer of protection.
7 fountain submersible pump in winter must be disabled during the cooling water pump light, avoid freezing damage. (oil cooling need to close the valve)
The 8 winter fountain should be discontinued in the pipeline water drainage, to prevent cracking pipes.
9 the fountain to half a year of cleaning, cleaning the nozzle and the water under the shower nozzle and the water, to prevent damage.
10 when the solenoid valve diaphragm to replace the object in the pipe to clean up all the dry static; fastening screws to the diagonal sequence.
11 underwater lamp replacement must be under the condition of no water, and the bolt fastening.
12 to ensure that the fountain flower beautiful consistent, to change the angle of the nozzle at any time
Bit, the use of sharp objects to prevent the use of sharp objects to prevent damage to the nozzle.
13 fountain electrical equipment to maintain the regular maintenance, six months to the cabinet in order to detect electrical apparatus for the maintenance of the necessary maintenance.
14 computer to upgrade to the computer and the necessary maintenance.
15 every six months to check the cable aging in the water, to avoid unnecessary loss.
16 every six months to assess the operation of the fountain, to strengthen the use of management.
17 every year a fountain pipe cleaning and maintenance.
18 every year to the fountain of the swing mechanism for maintenance and maintenance.